Standard Terms of Engagement form part of the contract between
the Surveyor and the Client for properties in Scotland. A different
form of the HOMEBUYER Survey and Valuation Service applies in
the other parts of the United Kingdom.
- PART
1:
- General
- 1:
The Service. The standard HOMEBUYER Survey & Valuation
Service ("the Service") which is described in Part 2 of these
Terms ("the Description") applies unless an addition to the Service
is agreed in writing before the Inspection. (An example of such
an addition is reporting upon parts which are not normally inspected,
such as the opening of all windows.)
2:
The Surveyor who provides the Service will be a Chartered
Surveyor who is competent to survey, value and report upon the
Property which is the subject of these Terms.
3:
Before the Inspection. The Client will inform the Surveyor
of the agreed price for the Property, or more commonly the asking
price for the Property, and of any particular concerns (such as
plans for extension) which he or she may have about the Property.
4:
Terms of payment. The Client agrees to pay the fee and
any other charges agreed in writing.
5:
Cancellation. The Client will be entitled to cancel this
contract by notifying the Surveyor's office at any time before
the day of the Inspection. The Surveyor will be entitled not to
proceed with the provision of the Service (and will so report
promptly to the Client) if, after arriving at the Property, he
or she concludes:
a) that it is of a type of construction of which he or
she has insufficient specialist knowledge to be able to provide
the Service satisfactorily; or
b) that it would be in the typical Client's best interests
to be provided with a Building Survey, plus valuation, rather
than the HOMEBUYER Service.
In case of cancellation, the Surveyor will refund any money paid
by the Client for the Service, except for expenses reasonably
incurred. In the case of cancellation by the Surveyor, the reason
will be explained to the Client.
6:
Liability. The Report provided is solely for the use of
the Client and the Client's professional advisers, and no liability
to anyone else is accepted. Should the Client not act upon specific,
reasonable advice contained in the Report, no responsibility is
accepted for the consequences.
-
- PART
2:
- DESCRIPTION
OF THE HOMEBUYER SERVICE
- A:
The Service.
- A1
The HOMEBUYER Service comprises:
-
an Inspection of the Property (Section B below)
- a
concise Report based on the Inspection (Section C)
- the
Valuation, which is part of the Report (Section D)
A2
The Surveyor's main objectives in the HOMEBUYER Service are
to give guidance on value to Clients considering buying a particular
Property together with the professional advice which will assist
them:
- to
make a reasoned and informed judgement on whether or not to
proceed with the purchase
-
to assess at what price it would be reasonable to purchase
the Property
- to
be clear what decisions and actions should be taken before
making an offer to purchase.
A3
The HOMEBUYER Service therefore covers the general condition
of the Property and particular features which affect its present
value and may affect its future resale. The Report focuses on
what the Surveyor judges to be urgent or significant matters.Significant
matters are those which, typically, would be reflected in the
offer made.
- B:
The Inspection
- B1
The Inspection is a general surface examination of those parts
of the Property which are accessible: in other words, visible
and readily available from examination from ground and floor
levels, without risk of causing damage to the Property or
injury to the Surveyor. Due care is therefore exercised
throughout the Inspection regarding safety, practicality and
the constraints of being a visitor to the Property (which
may be occupied). So furniture, floor coverings and other
contents are not moved or lifted; and no part is forced or
laid open to make it accessible.
B2
The services are inspected (except, in the case of flats,
for drainage, lifts and security systems), but the Surveyor
does not test or assess the efficiency of electrical, gas,
plumbing, heating or drainage installations, or compliance
with current regulations, or the internal condition of any
chimney, boiler or other flue. Also, the Surveyor does not
research the presence (or possible consequences) of contamination
by any harmful substance. However, if a problem is suspected
in any of these areas, advice is given on what action should
be taken.
B3
Where necessary, parts of the Inspection are made from adjoining
public property. Such equipment as a damp-meter, binoculars
and torch may be used. A ladder is used for hatches and also
for flat roofs not more than three metres above ground level.
Leisure facilities and non-permanent outbuildings (such as
pools and timber sheds) are noted but not examined. In the
case of flats, exterior surfaces of the building containing
the Property, as well as the communal areas within the building,
are examined in order to assess their general condition; accessible
roof spaces are inspected.
C: The Report
- C1
The Report provides the Surveyor's opinion of those matters
which are urgent or significant and need action or evaluation
by the Client before an offer to purchase is made. It includes
some or all of the following:
-
- urgent
repairs (e.g. gas leak; defective chimney stacks) - for
which the Client should obtain quotations where appropriate
- significant
matters requiring further investigation where essential
(e.g. suspected subsidence) - for which the Client should
obtain (and may have to pay for) reports and quotations from
suitable contractors
- significant
but not urgent repairs and renewals (e.g. new covering
for flat roof before long)
- other
significant considerations (e.g. some potential source
of inconvenience) which the Surveyor wishes to draw to the
attention of the Client
- legal
matters(e.g. a possible right of way) which the Client
should instruct the Legal Advisers to include in their inquiries.
C2 Matters assessed as not urgent or not significant are
outside the scope of the HOMEBUYER Service and are generally
not reported. However, other matters (such as safety) are
reported where the Surveyor judges this to be helpful and
constructive. If a part or area normally examined is found
to be not accessible during the Inspection, this is reported;
if a problem is suspected, advice is given on what action
should be taken
C3 The Report is in a standard format arranged in the
following sequence: Introduction & Overall Opinion; The
Property & Location; The Building; The Services & Site; Legal
& Other Matters; Summary; Valuation.
D: The Valuation and Reinstatement Cost
- D1
The last section of the Report contains the Surveyor's opinion
both of the Open Market Value of the Property and of the Reinstatement
Cost, as defined below
D2
"Open Market Value" is the best price at which
the sale of an interest in property would have been completed
unconditionally for cash consideration on the date of valuation.
In arriving at the opinion of the Open Market Value, the Surveyor
also makes various standard assumptions covering, for example:
vacant possession; tenure and other legal considerations;
contamination and hazardous materials; the condition of uninspected
parts; the right to use mains services; and the exclusion
of curtains, carpets, etc., from the valuation. (If required,
details are available from the Surveyor.) In the case of flats,
the following further assumptions are made that:
- there
are rights of access and exit over all communal roadways,
corridors, stairways etc. and to use communal grounds, parking
areas and other facilities;
- there
are no particularly troublesome or unusual legal restrictions;
- there
is no current dispute between the occupiers of the flats,
or any outstanding claims or lawsuits; and the costs of repairs
to the building are shared among the co-proprietors on an
equitable basis.
Any additional assumption, or any found not to apply, is reported.
D3
"Reinstatement Cost" is an estimate for insurance purposes
of the current cost of rebuilding the Property in its present
form, unless otherwise stated. This includes the cost of
rebuilding the garage and permanent outbuildings, site clearance
and professional fees, but excludes VAT (except on fees).
|
|
|
|